City of Napa · Solicitation 2026-RFQL-054

Request for Qualifications - Conn Dam Stability Assessment, Spillway Improvements, and Feasibility Alternatives Study

Napa, CA City Posted Oct 5, 2026 Last verified Oct 27, 9:20 AM
Excavation & Grading General Contracting Surveying & Engineering 2 days remaining

What this bid is

The City of Napa Utilities Department wants to hire engineering consultants for a Request for Qualifications on the Conn Dam in Napa, California. The work covers a stability assessment of the earthen dam, improvements to the spillway, and a feasibility study of long-term reservoir expansion. Services listed include geotechnical, hydraulic, structural, environmental, dam safety and economic evaluation work, with the first phase a geotechnical data report due to the state Division of Safety of Dams by December 31, 2028. The notice says the City expects federal funding to be part of later design and construction, so the selection will follow a qualifications-based process.

Questions are due October 19, 2026 at 5:00 PM PDT, and responses are due October 29, 2026 at 4:00 PM PDT. Responses are submitted electronically through the City's OpenGov portal, which requires a free vendor account. The contact is Adam Nelkie, Deputy Utilities Director, at anelkie@cityofnapa.org or (707) 257-9316. The City makes the selection decision.

Who should bid

Excavation & Grading, General Contracting, Surveying & Engineering contractors - the work is Napa, CA.

Deadline

29 October 2026, 4:00 PM PDT (2 days remaining - last confirmed 27 Oct)

How to submit

On the agency's own system, not on BusyBids. Open the official notice

As the agency published it

City of Napa - Utilities Department has issued request for qualification, solicitation 2026-RFQL-054.

1. Introduction The City of Napa (“ City ”) requests qualifications (“ Qualifications ”) from qualified individuals or firms (individually, a “ Respondent ” and collectively, “ Respondents ”) for Request for Qualifications - Conn Dam Stability Assessment, Spillway Improvements, and Feasibility Alternatives Study (“ Project ”). The City is seeking highly qualified multidisciplinary engineering consulting firms specialized in dams to provide professional engineering, geotechnical, environmental, hydraulic, structural, dam safety, and economic evaluation services for the Conn Dam Stability Assessment, Spillway Improvements, and Long-Term Reservoir Expansion Feasibility Study. The selected Consultant shall provide comprehensive engineering services to support regulatory compliance with the California Division of Safety of Dams (DSOD), assist the City in advancing federally authorized flood risk reduction studies through the U.S. Army Corps of Engineers (USACE), evaluate long-term improvements to increase water supply reliability, and prepare the technical basis for future environmental review, design, permitting, and construction. The City intends to procure these services using a Qualifications-Based Selection (QBS) process consistent with applicable federal procurement requirements, including 2 CFR Part 200 and the principles of the Brooks Act, as it is anticipated federal funding will be a part of the design and construction funding. The first phase of the project will generate a geotechnical data report that must be submitted to DSOD by December 31, 2028 followed by phase two with an assessment of the dam’s stability, including deformation estimates, under static and seismic conditions. Phase three will develop a feasibility alternatives analysis report addressing all identified deficiencies including the known spillway deficiencies. The City has been included by project name Conn Creek Dam, California in the 2022 Water Resources Development Act of 2022 (WRDA) and requested to be included in the USACE WRDA 2028 workplan with goal of completion of the alternative and design within 3 years inclusion in work plan.

2. Project Background The City is a charter city located in Napa County, with an estimated population of 80,000. Additional information about the City is available online at www.cityofnapa.org. Conn Dam is a critical component of the City of Napa's municipal water supply system and impounds Lake Hennessey, the City's primary local water storage reservoir. Constructed in the mid-1940s, Conn Dam is an approximately 110-foot-high zoned earthen embankment dam with a crest length of approximately 700 feet. The embankment consists primarily of compacted impervious clay with upstream rock slope protection and impounds approximately 31,500 acre-feet of water. Since its construction, multiple engineering evaluation and feasibility studies have been completed to assess the dam, spillway, intake facilities, and long-term water supply needs. Major milestones include: Year Study 1945 Original Construction 1965 DWR Geologic Investigation 1982 DSOD Safety Review, Seismic, Geotechnical, Condition 1986 Hydrologic Analysis Report Conn Dam Watershed and Spillway 1986 Seismic Stability Evaluation 1988 Spillway Predesign Alternatives 1990 Intake Structure Seismic Assessment 1992 Lake Enlargement Feasibility Study 2003 Intake Tower Rehabilitation 2018 Bathymetric Survey and Mapping 2018 DSOD Spillway Re-evaluation 2019 2019 2020 2022 Feasibility Assessment for Probable Maximum Flood Management at Lake Hennessey Conn Creek Dam Inundation Study Supplemental Spillway Investigations Napa Valley Drought Contingency Plan 2023 Spillway Repairs 2023 Fusegate System Technical and Budget Proposal 2026 DSOD Independent Review The 2018 Spillway Re-evaluation Program, initiated following the Oroville Dam Spillway Incident, confirmed that the existing spillway no longer satisfies current Probable Maximum Flood (PMF) design criteria. Subsequent reviews by DSOD requested additional alternatives analyses to identify permanent improvements. In June 2026, DSOD completed an independent review identifying additional concerns regarding the long-term geotechnical stability of the dam embankment and requested submission of a comprehensive geotechnical investigation report by December 31, 2028. Separately, Congress reauthorized the Conn Dam Flood Risk Management Feasibility Study under the Water Resources Development Act of 2022 (WRDA 2022). The City continues to coordinate with the U.S. Army Corps of Engineers to secure General Investigation funding for the federally authorized feasibility study and is working to incorporate the full project in the 2028 workplan. The City has also submitted an application under the Corps Water Infrastructure Financing Program (CWIFP) for future construction financing.

Responses are due October 29, 2026 at 4:00 PM PDT.

Questions must be submitted by October 19, 2026 at 5:00 PM PDT.

Contact: Adam Nelkie, Deputy Utilities Director (anelkie@cityofnapa.org, (707) 257-9316).

14 documents are attached to the notice: TM_-_Conn_Creek_Dam_Phase_II_Spillway_Assessment_2020-08-17; Exhibit A = Services_Agreement_(Professional_Services)_(2024-08-29); Geological_Report_1982_ (1); Memorandum_of_Geologic_Inspection_1965; App_B-Conn_Dam_Spillway_Hydraulic_Analysis_28Mar2018-Final_(1); DSOD_Inspection_Reports_on_Spillway_1996-2002 (1); City_of_Napa_Public_Works_Department_Summary_Report_and_Cost_Estimate_Conn_Dam_Spillway_Modification_Study_Mar_1,_1968; LakeHennesseyBathymetryMap (1).

The full solicitation document, addenda and the question-and-answer thread are on the agency's OpenGov portal at https://procurement.opengov.com/portal/cityofnapa/projects/310126. Responses are submitted electronically there, and a free vendor account is required before you can upload one.

Reproduced from the official notice via OpenGov Procurement - California. The agency's page is the one that counts.

What the notice says

Questions due
19 Oct 2026
Evaluation
The City is seeking highly qualified multidisciplinary engineering consulting firms specialized in dams to provide professional engineering, geotechnical, environmental, hydraulic, structural, dam safety, and economic evaluation services for the Conn Dam Stability Assessment,...

Read from the notice's own wording. BusyBids holds the notice, not the attached documents, and never assesses whether you meet a requirement - confirm anything that matters with the issuing agency.

Check before bidding

  • Questions close on 20 October, before the bid deadline.
  • Only 2 days left to prepare a bid.

Taken from the notice as published. BusyBids does not assess whether you meet a requirement - confirm anything that matters with the issuing agency.

Important dates

Add all to calendar
EventDate and time
Questions due 19 October 2026, 5:00 PM PDT check
Bid deadline2 days remaining - last confirmed 27 Oct 29 October 2026, 4:00 PM PDT check 2 days

Times are shown in the agency's own zone. Confirm every deadline against the official notice.

Save this bid

We will remind you before it closes and tell you if the deadline moves. Free, no password, one click to stop.

We never share your address. No password needed.

Where this came from

Collected from OpenGov Procurement - California, first seen 6 October 2026, last confirmed 27 October 2026.

The notice text above and every date and requirement are reproduced from the source. Confirm every deadline against the official notice before you bid.

Something wrong with this listing? Tell us.

We reproduce what the agency published. If we got it wrong we want to know - a wrong deadline can cost you a bid.

Similar open bids

About City of Napa

BusyBids has tracked 3 notices from City of Napa since September 2026, 2 of them open now. The open work falls under Excavation & Grading, General Contracting, Paving & Asphalt.

Every City of Napa bid BusyBids tracks