Water Engineering Services (BOA)
What this bid is
Engineering services under a Blanket Order Agreement for the water distribution system of the Washington Suburban Sanitary Commission (WSSC Water) in Laurel, Maryland. The main job is maintaining, updating, calibrating and analyzing WSSC's computerized hydraulic model, which is built in WaterGEMS. Related planning work listed includes 20-year water demand projections, water loss reduction studies, reclaimed water feasibility, system redundancy and resiliency analysis, review of proposed growth, and technical support for planning and capital improvement programs.
The notice does not state a contract value, term or duration. Solicitation 1177 is posted on WSSC's OpenGov portal.
Questions are due 30 October 2026 at 2:00 PM EDT. A pre-proposal conference is set for 27 October 2026 at 11:00 AM EDT on Microsoft Teams. The notice calls it non-mandatory, but BusyBids' record flags it as mandatory, so check the portal before deciding. Responses are due 18 November 2026 at 2:00 PM EST, and late responses will not be accepted.
Submit electronically through the WSSC eProcurement portal on OpenGov, which requires a free vendor account. The agency decides the award. Contact is Kimberly Six, Section Manager, at kimberly.six@wsscwater.com or (301) 206-8994.
Who should bid
Plumbing, General Contracting, Site Utilities, Surveying & Engineering contractors - the work is Laurel, MD.
Deadline
18 November 2026, 2:00 PM EST (4 days remaining - last confirmed 13 Nov)
How to submit
On the agency's own system, not on BusyBids. Open the official notice
As the agency published it
Washington Suburban Sanitary Commission, MD - Engineering & Construction Department has issued ifb/rfp template - goods, services, and professional services, solicitation 1177.
The Washington Suburban Sanitary Commission, MD (the "WSSC"), is soliciting sealed responses for Water Engineering Services (BOA). Responses are to be submitted via WSSC's eProcurement Portal via https://procurement.opengov.com/portal/wsscwater PRIOR TO 2:00 PM on November 18, 2026. Late responses will not be accepted. The primary purpose of this Blanket Order Agreement (BOA) is to provide specialized engineering services to support the ongoing maintenance, enhancement, calibration, and evaluation of WSSC Water's water distribution system through the use of its computerized hydraulic model within the WaterGEMS modeling platform. As WSSC Water's standardized hydraulic modeling software, WaterGEMS is a critical planning and operational tool that requires advanced technical expertise to ensure the accuracy, reliability, and effectiveness of system analyses. In addition to hydraulic model updates and calibration, the BOA will provide engineering support for a variety of water system planning and evaluation initiatives, including: Updating 20-year water demand projections to support long-range planning. Evaluating water loss reduction initiatives and their impacts on system performance. Assessing the feasibility and implementation of potential reclaimed water systems. Analyzing system redundancy and resiliency to improve reliability and operational flexibility. Reviewing proposed growth and development to assess impacts on the water distribution system and associated infrastructure. Providing technical analyses and recommendations to support strategic planning, capital improvement programs, and system optimization. Through these services, the BOA will ensure WSSC Water maintains a reliable, resilient, and efficiently managed water distribution system while supporting future growth, regulatory compliance, and long-term infrastructure planning.
The Washington Suburban Sanitary Commission (WSSC Water) is a bi-county agency and public corporation of the State of Maryland, established in 1918 to provide water supply and wastewater services to residents and businesses in Montgomery and Prince George’s Counties. The Commission is among the largest water and wastewater utilities in the nation, with a network of approximately 5,900 miles of potable water pipelines and more than 5,400 miles of sewer pipelines, serving 1.9 million residents. WSSC Water’s Planning Division operates and maintains an all-pipes computerized hydraulic water model in the Bentley WaterGEMS modeling package. The model contains approximately 167,000 pipes; 153,000 nodes, 51 tanks, 19 pump stations, and 380 control valves (pressure reducing valves and flow control valves). The Planning Division recently oversaw an extensive update of the all-pipes model using a consultant. The model simulates average day and maximum day demand conditions under existing and future conditions. The model utilizes extended period simulations and is operationally calibrated to reflect actual system operations in the field. The future demands are based on Metropolitan Washington Council of Governments (MWCOG) demographic projections, based on Round 10.0 data. The model is an integral tool utilized by WSSC to analyze operational concerns associated with planned and emergency shutdowns, to provide support in the design and construction of capital projects, and determine the improvements necessary to provide adequate capacity to satisfy existing and future demands; and in the development of a long-range Capital Improvement Plan (CIP). The Water and Wastewater Planning Section is also integral Water Master and Facility Planning Program as well as the overall Asset Management Program that is embedded throughout WSSC Water. Results from the hydraulic modeling will be used to inform the Master Planning effort and will be evaluated for possible inclusion in the CIP.
Responses are due November 18, 2026 at 2:00 PM EST.
Questions must be submitted by October 30, 2026 at 2:00 PM EDT.
A non-mandatory pre-proposal conference is scheduled for October 27, 2026 at 11:00 AM EDT at Microsoft Teams meeting: https://teams.microsoft.com/meet/2555338602830470?p=hjRaBk5UBEypVUE6GI.
Commodity categories: Engineering Services.
Contact: Kimberly Six, Section Manager (kimberly.six@wsscwater.com, (301) 206-8994).
2 documents are attached to the notice: SAMPLE BOA FOR 120590; Mid-Atlantic Purchasing Team Intergovernmental & Cooperative Purchasing Clause.
The full solicitation document, addenda and the question-and-answer thread are on the agency's OpenGov portal at https://procurement.opengov.com/portal/wsscwater/projects/312920. Responses are submitted electronically there, and a free vendor account is required before you can upload one.
Reproduced from the official notice via OpenGov Procurement - Maryland. The agency's page is the one that counts.
What the notice says
- Site visit
- Mentioned
- Submission
- Responses are to be submitted via WSSC's eProcurement Portal via https://procurement.
- Questions due
- 30 Oct 2026
- Evaluation
- The primary purpose of this Blanket Order Agreement (BOA) is to provide specialized engineering services to support the ongoing maintenance, enhancement, calibration, and evaluation of WSSC Water's water distribution system through the use of its computerized hydraulic model...
Read from the notice's own wording. BusyBids holds the notice, not the attached documents, and never assesses whether you meet a requirement - confirm anything that matters with the issuing agency.
Check before bidding
- The notice describes a mandatory site visit or pre-bid meeting - a bid from anyone who did not attend is usually rejected unopened.
- The notice lists a pre-bid meeting on 27 October - check whether attendance is mandatory.
- Questions close on 30 October, before the bid deadline.
- Only 4 days left to prepare a bid.
Taken from the notice as published. BusyBids does not assess whether you meet a requirement - confirm anything that matters with the issuing agency.
Important dates
Add all to calendar| Event | Date and time | |
|---|---|---|
| Pre-bid meetingcheck the notice for whether attendance is mandatory | 27 October 2026, 11:00 AM EDT check | |
| Questions due | 30 October 2026, 2:00 PM EDT check | |
| Bid deadline4 days remaining - last confirmed 13 Nov | 18 November 2026, 2:00 PM EST check | 4 days |
Times are shown in the agency's own zone. Confirm every deadline against the official notice.
Save this bid
We will remind you before it closes and tell you if the deadline moves. Free, no password, one click to stop.
We never share your address. No password needed.
Where this came from
Collected from OpenGov Procurement - Maryland, first seen 15 October 2026, last confirmed 13 November 2026.
The notice text above and every date and requirement are reproduced from the source. Confirm every deadline against the official notice before you bid.
Something wrong with this listing? Tell us.
We reproduce what the agency published. If we got it wrong we want to know - a wrong deadline can cost you a bid.
Similar open bids
-
Posted Oct 10 Checked yesterday Special districtDue Nov 16, 2:00 PM EST 2 days left
-
Posted Oct 8 Checked yesterday CountyDue Nov 17, 3:00 PM EST 3 days left
-
Posted Oct 15 Checked yesterday Special districtPrevailing wage appliesDue Nov 19, 2:00 PM EST 5 days left
-
Posted Oct 23 Checked yesterday Special districtDue Nov 19, 2:00 PM EST 5 days left
-
Posted Oct 20 Checked yesterday Special districtMandatory site visitDue Nov 19, 2:00 PM EST 5 days left
-
Posted Sep 16 Checked yesterday CityBond requiredDue Nov 19, 3:00 PM EST 5 days left
About Washington Suburban Sanitary Commission, MD
BusyBids has tracked 25 notices from Washington Suburban Sanitary Commission, MD since September 2026, 14 of them open now. The open work falls under Plumbing, General Contracting, Site Utilities.
Every Washington Suburban Sanitary Commission, MD bid BusyBids tracks