Lacy Springs/Cool Springs Contamination Area Water Improvements
What this bid is
Joint Municipal Water and Sewer Commission in Lexington, South Carolina is asking for bids on water line work in the Lacy Springs/Cool Springs area. The job is to install about 6,300 feet of 10-inch line, 1,100 feet of 6-inch line and 1,100 feet of 4-inch line, plus service connections to identified properties, so those homes and businesses get a clean water source to replace contaminated groundwater. The estimated cost range is $400,000 to $700,000. The project is funded by a State Revolving Fund loan and uses design-bid-build delivery.
The notice says prevailing wage rates apply, so labour has to be priced at the published rates, and it says Davis-Bacon and Build America, Buy America requirements apply. Bids are due 24 November 2026 at 2:00 PM EST. Bidders are asked to submit one copy. The full invitation to bid is bid-invitation-to-bid-10.20.2026.pdf, and documents can be requested by email from Chad Easter at Highfill Infrastructure Engineering at ceaster@hiepc.com. The agency decides who is awarded the work.
Who should bid
General Contracting, Site Utilities contractors - the work is Lexington, SC.
Deadline
24 November 2026, 2:00 PM EST (27 days remaining - last confirmed 27 Oct)
How to submit
On the agency's own system, not on BusyBids. Open the official notice · Bid documents
As the agency published it
The project includes installation of approximately 6,300 LF of 10-inch, 1,100 LF of 6-inch, and 1,100 LF of 4-inch water lines, along with service connections to identified properties, to provide a potable water source to replace contaminated groundwater sources. Funded by a loan from the State Revolving Fund. Bidders must comply with all applicable state/federal requirements identified in the bid docs, including Davis-Bacon and “Build America, Buy America. See link for Invitation to Bid. Buyer: Joint Municipal Water and Sewer Commission. Category: Construction. Project location as advertised: Lexington, SC. Delivery method: Design-Bid-Build. Construction cost range: $400K-$700K. Copies required: 1. Documents may be obtained from: Highfill Infrastructure Engineering - Chad Easter via Email: ceaster@hiepc.com. Advertised in South Carolina Business Opportunities (SCBO). Full details and documents: https://www.lcjmwsc.com/sites/default/files/uploads/projects/documents/bid-invitation-to-bid-10.20.2026.pdf
Reproduced from the official notice via SCBO - South Carolina Business Opportunities. The agency's page is the one that counts.
What the notice says
- Prevailing wage
- Mentioned
Read from the notice's own wording. BusyBids holds the notice, not the attached documents, and never assesses whether you meet a requirement - confirm anything that matters with the issuing agency.
Check before bidding
- The notice says prevailing wage rates apply - your labour costs have to be priced at the published rates, and certified payroll usually follows.
Taken from the notice as published. BusyBids does not assess whether you meet a requirement - confirm anything that matters with the issuing agency.
Important dates
Add all to calendar| Event | Date and time | |
|---|---|---|
| Bid deadline27 days remaining - last confirmed 27 Oct | 24 November 2026, 2:00 PM EST check | 27 days |
Times are shown in the agency's own zone. Confirm every deadline against the official notice.
Bid documents
Downloaded from the agency, not from us - we link the package rather than hosting a copy, so you always get the current version.
Save this bid
We will remind you before it closes and tell you if the deadline moves. Free, no password, one click to stop.
We never share your address. No password needed.
Where this came from
Collected from SCBO - South Carolina Business Opportunities, first seen 22 October 2026, last confirmed 27 October 2026.
The notice text above and every date and requirement are reproduced from the source. Confirm every deadline against the official notice before you bid.
Something wrong with this listing? Tell us.
We reproduce what the agency published. If we got it wrong we want to know - a wrong deadline can cost you a bid.
Similar open bids
-
$8K - $16K estimated Posted Oct 19 Checked today Special districtDue Oct 27, 5:00 PM EDT Closes today
-
Posted Sep 29 Checked today Special districtDue Oct 27, 5:00 PM EDT Closes today
-
$6 - $26 estimated Posted Sep 16 Checked today CityDue Oct 28, 2:00 AM EDT Closes today
-
Posted Sep 24 Checked today CountyDue Oct 28, 11:00 AM EDT Closes today
-
Posted Oct 8 Checked 2 days ago FederalDue Oct 28, 12:00 PM EDT Closes today
-
$325K - $350K estimated Posted Sep 18 Checked today StateLicense requiredDue Oct 28, 2:00 PM EDT Closes today
About Joint Municipal Water and Sewer Commission
BusyBids has tracked 3 notices from Joint Municipal Water and Sewer Commission since September 2026, 1 of them open now. The open work falls under General Contracting, Site Utilities.
Every Joint Municipal Water and Sewer Commission bid BusyBids tracks