P#1112666 | Centennial Program | New Park Development | Silver Lake State Park
Plain-English summary
Verify against the official noticeWhat the agency needs
Parks & Wildlife Department: The Infrastructure Division of the Texas Parksand Wildlife Department (TPWD) is issuing a Request for Proposals (RFP) fora Construction Manager-at-Risk (CMR). This solicitation will follow a one-stepRFP process in accordance with Texas Government Code Section 2269.253. &
The Infrastructure Division of the Texas Parksand Wildlife Department (TPWD) is issuing a Request for Proposals (RFP) fora Construction Manager-at-Risk (CMR). This solicitation will follow a one-stepRFP process in accordance with Texas Government Code Section 2269.253. Project Number: 1112666 Project Name: Centennial Program – New Park Development Project Location: Silver Lake State Park; Edwards andKinney Counties, Texas Solicitation: Construction Manager at Risk Construction Cost Estimate: $35 Million ConstructionManager-at-Risk Deliverables: PARTONE - PRE-CONSTRUCTION: The awarded Contractor shall collaborate with TPWD and itsArchitects and Engineers during the development of construction documents,including review and comment exercises on Schematic Design; Design Development;and 50%, 95% and 100% Construction Documents. The Contractor’s expertise will be used to guide value engineering,constructability decisions, construction phasing, and ultimately set theGuaranteed Maximum Price (GMP) within the limits established by the contract.The services during Pre-Construction shall include but not be limited to; attendingmeetings, plan reviews, constructability reviews and cost estimating. The Contractor shall be proactive inrecommending strategies to help minimize impact to the schedule and budget.Certain activities that serve to maintain the project schedule and budget maybe conducted during Pre-Construction Services; such as permitting coordination,early procurement planning for long lead items, Design- Assistance (ifneeded) and early engagement of major subcontractors. PARTTWO – CONSTRUCTION: Inaccordance with the approved schedule and GMP, the Contractor shall facilitatebidding and selection of labor in accordance with state requirements for goodfaith effort to engage Veteran Heroes United in Businesses, and provide for allmaterials, installations, labor, coordination, management and supervisoryactivities necessary to complete construction of the project in accordance withthe drawings, specifications and other contract documents that will be preparedby the Architect, Engineers and TPWD. General Scope of Work Project No. 1112666 titled “Centennial Program– New Park Development” is being solicited to develop a newly acquired over50,000 acre ranch tract in Edwards and Kinney Counties for a new Silver LakeState Park for the state of Texas. The acquired property is located approximately 25 miles south of RockSprings, Texas and 11 miles west of Camp Wood, Texas and includes riverfrontage. The tract’s geographiclocation is approximately Latitude 29°33’ N; Longitude 100°12’ W. The scope of this project includespre-construction services and construction of the new park development. The following list outlines the desired scopecomponents for the new park development. Under the Construction Manager at Risk(CMR) delivery method, the selected CMR will collaborate with TPWD and theArchitect/Engineer of Record to evaluate feasibility, prioritize scope, andalign work with available funding as the project progresses to deliver thehighest achievable value within the established budget and performance period. TPWD plans for the fully constructed park toinclude but not be limited to: Park entry and monument signage Electrical access gate(s) Paved Roadways including low water crossing(s) Gravel Roadways Parkwide directional signage Operational Facilities to include Park Headquarters, staff residences, park host sites, maintenance yard and supporting buildings Day Use Facilities to include trailheads, multi-use trails, picnic areas, group pavilion(s), amphitheater, Nature Center, playground, wildlife viewing areas, restrooms, parking areas Overnight Facilities to include developed and primitive camping areas, mini-cabins, screened shelters, restrooms and associated parking areas Site utili
Posted to the Electronic State Business Daily by Parks & Wildlife Department (Texas SmartBuy member 802).
Status: Posted.
Posting requirement: 21+ Days for Solicitation Notice.
Class/item codes: 91831-Construction Consulting; 92544-General Construction: Management, Scheduling, Cost Estimation; 96121-Cost Estimating.
Contact: Nicole Chupka, nicole.chupka@tpwd.texas.gov, (512) 389-8823
Documents and instructions: https://tpwd.cobblestone.software/Gateway/solicitationdetails?solicid=67
Submit responses at: https://tpwd.cobblestone.software/Gateway/solicitationdetails?solicid=67
Submit responses to: nicole.chupka@tpwd.texas.gov
Attachments:
Full notice: https://www.txsmartbuy.gov/esbd/1112666
Who should bid
General Contracting contractors - the work is Statewide - TX.
Deadline
27 October 2026, 2:00 PM CDT (25 days remaining - last confirmed 1 Oct)
How to submit
On the agency's own system, not on BusyBids. Open the official notice · Bid documents
Important dates
Add all to calendar| Event | Date and time | |
|---|---|---|
| Bid deadline25 days remaining - last confirmed 1 Oct | 27 October 2026, 2:00 PM CDT check | 25 days |
Times are shown in the agency's own zone. Confirm every deadline against the official notice.
Bid documents
Downloaded from the agency, not from us - we link the package rather than hosting a copy, so you always get the current version.
Save this bid
We will remind you before it closes and tell you if the deadline moves. Free, no password, one click to stop.
We never share your address. No password needed.
Where this came from
Collected from Texas ESBD (TxSmartBuy), first seen 16 September 2026, last confirmed 1 October 2026.
Dates and requirements are reproduced from the source. Confirm every deadline against the official notice before you bid.
Something wrong with this listing? Tell us.
We reproduce what the agency published. If we got it wrong we want to know - a wrong deadline can cost you a bid.
Similar open bids
-
up to $41K estimated Posted Sep 10 StateBond requiredDue Oct 2, 10:00 AM CDT Closes today
-
Posted Sep 22 FederalDue Oct 2, 1:00 PM EDT Closes today
-
Posted Sep 4 CityDue Oct 2, 2:00 PM CDT Closes today
-
Posted Sep 4 CityDue Oct 2, 2:00 PM CDT Closes today
-
up to $1.5M estimated Posted Aug 28 CityPre-bid meetingDue Oct 2, 2:00 PM CDT Closes today
-
up to $120M estimated Posted Sep 2 Special districtPre-bid meetingDue Oct 2, 2:00 PM CDT Closes today