Resources

Higher education

Published government contract notices, guides and news.

All guides · Browse all open bids

Sansbury CLC Ren. Atrium Evacuation Assessment & Rep.

Update and restoration of atrium smoke evacuation system including interaction with door controllers and fire alarm system.

Opportunity · 25 September 2026

SIRRINE HALL ELECTRICAL UPGRADE

Demolish and replace the 4000A, 208V switchgear and replace with new. Demolish and replace multiple panels and miscellaneous apparatus on multiple building levels per GWA design drawings

Opportunity · 25 September 2026

Hardscramble Pavillion-Camden, SC

Construct a Shelter at Hardscramble Pavillion

Opportunity · 25 September 2026

Basic Science Building 7 East Lab and Office Renovations - Phase A

Renovation of approximately 1,991 SF of open shell area of BS741 into one laboratory and two tissue culture rooms. Work includes new wood doors, metal door frames, gypsum board walls, acoustical ceilings, sheet flooring, finishes, and associated mechanical, electrical, and plumbing.

Opportunity · 25 September 2026

MUSC 20 Ehrhardt Dr. HVAC Renovation

Replacement of HVAC equipment along with associated electrical connections.

Opportunity · 25 September 2026

24 North Market Street

Construction of a 70,000 sqft business school at 24 N. Market Street where currently a 40,000 sqft 1980's building resides that is slated for for demolition. This project includes a renovation to the 4000 sqft historic building on the land. This new property will contain instructional spaces, office

Opportunity · 25 September 2026

Campbell Graduate Engineering Center, Flex Lab One

Upfit of space to include 3D printing lab, automotive shop and battery testing lab

Opportunity · 25 September 2026

Martin Hall Site Redevelopment

The project will demolish the existing building, address aging storm, sewer and steam infrastructure, and construct a replacement building. The new building will provide modern instructional spaces, including one 192-seat auditorium, four 48-seat classrooms, nine 45-seat SCALE-UP classrooms, one 56-

Opportunity · 25 September 2026

Thornley Campus Building 920 Roof Replacement - Phase 1

Base Bid: Scope of work includes roof replacement of Roof Area A for approximately 895 squares. Including but not limited to roof deck repairs, insulation, a modified bitumen roof system and associated sheet metal components and accessories. Alternate #1: Addition of approximately 864 squares. Alter

Opportunity · 25 September 2026

Parkway Drive Parking Improvements

Create a new parking lot that will add 200+ parking spaces to serve the campus community, setting the stage for the removal of the parking lot south of Sikes Hall and the replacement of Martin Hall. The project will also include realignment of the vehicular connection to Cherry Road, as well as enha

Opportunity · 25 September 2026

MUSC CSB 4th Floor Corridor Renovation

This project consists of an interior renovation of the 4th-floor corridor at the MUSC Clinical Science Building. The scope includes selective demolition and reconfiguration of existing spaces, along with new architectural finishes, ceilings, and flooring. Work also includes coordination with abateme

Opportunity · 25 September 2026

MUSC CSB 4th Floor Corridor ACM Abatement

This project consists of ACM removal in accordance to project design.

Opportunity · 25 September 2026

Genesis Hall Health and Wellness Center Renovations and Repairs

The renovation of the Student Health and Wellness Center’s portion of Genesis Hall. The project includes a demolition phase of select existing walls and ceilings, the redesigning of the floorplan, adding a roof-top HVAC unit to include curb, concrete work related to modifying an existing ADA curb, r

Opportunity · 25 September 2026

Palmetto House Fire Alarm System Replacement

The University of South Carolina are soliciting bids from a qualified contractor to remove existing fire alarm system and replace with new system including all devices. Work to be performed in summer, 2027. Bids must be hand delivered or mailed to 1600 Hampton Street, Suite 721, Columbia, SC. Please

Opportunity · 25 September 2026

CCTC - Health Science HVAC Replacement

Replace rooftop air handling units and heating hot water in place with associated controls and electrical.

Opportunity · 25 September 2026

McMaster College Envelope Restoration

Base Bid includes full removal/ replacement of sealants, wet sealing of all glazing, steel prep/prime/paint, replacement of expansion joints and covers, full facade cleaning, EIFS cornice repairs with elastomeric coating, selective masonry repointing, and abatement of minor non-friable ACM. Refer to

Opportunity · 25 September 2026

AI2C Building Renovation Building Commissioning Services

Seeking building and building systems Commissioning Services for our AI2C building renovation project. The submitting agency must provide examples of building construction and building system commissioning services and hold certification/s in these areas. The project is for a renovation of an existi

Opportunity · 25 September 2026

UNC Wilmington

University Suites - HVAC System Refurbishment - Advanced Planning

Opportunity · 25 September 2026

UNC Wilmington

Cornerstone Hall, Keystone House, Innovation House - HVAC System Refurbishments - Advanced Planned

Opportunity · 25 September 2026

Appalachian State University

Main Steam Line Replacement and Vault Access

Opportunity · 25 September 2026