City of Santa Monica · Solicitation 482

Santa Monica Groundwater Basin Monitoring Program

Santa Monica, CA City Posted Sep 28, 2026 Last verified Oct 26, 8:20 PM
General Contracting Environmental & Abatement Site Utilities

What this bid is

The City of Santa Monica is asking consultants and firms for proposals to run a groundwater monitoring, modeling and technical support program for the Santa Monica Groundwater Basin. The aim is to bring all state-required groundwater monitoring under one contract. The notice says the work covers State orders for the Charnock and Olympic well fields, drinking water production requirements under the Division of Drinking Water, coordination on basin groundwater sustainability planning, and monitoring and reporting tied to the City's Sustainable Water Infrastructure Project. The notice lists field sampling, laboratory analysis, data interpretation and preparation of regulatory reports as parts of the work. It does not state a budget, contract length or scope size in the text provided.

Questions are due 12 October 2026 at 3:00 PM PDT. Proposals are due 26 October 2026 at 3:00 PM PDT. Responses are submitted electronically through the City's OpenGov portal, and a free vendor account is needed to upload one. The contact is Tina Saloutos, Principal Buyer, at tina.saloutos@santamonica.gov or (310) 458-8281. The City decides who is selected.

Who should bid

General Contracting, Environmental & Abatement, Site Utilities contractors - the work is Santa Monica, CA.

Deadline

26 October 2026, 3:00 PM PDT (last confirmed 26 Oct)

How to submit

On the agency's own system, not on BusyBids. Open the official notice

As the agency published it

City of Santa Monica - Water Resources has issued request for proposal, solicitation 482.

The City of Santa Monica, (the "City”) is soliciting proposals from qualified consultants or firms to implement a groundwater monitoring, modeling, and technical support program for the Santa Monica Groundwater Basin (SMGB).

The Santa Monica Groundwater Monitoring Program (Program) aims to unite all State-mandated groundwater monitoring requirements under one contract to manage the basin sustainably and in full regulatory compliance. Specific State orders for the Charnock and the Olympic Well Fields will be implemented in full compliance with orders/permits. In addition to remediation activities to restore the groundwater basin water quality, the City is also currently operating under the Division of Drinking Water’s 97-005 Policy Memo requirements to produce drinking water from the Charnock and Olympic Well Fields. The selected consultant will also work with current City engineering consultants to meet regulatory reporting requirements for the Santa Monica Subbasin Groundwater Sustainability Plan (GSP) and the City’s groundwater recharge permit for its Sustainable Water Infrastructure Project (SWIP). The City of Santa Monica is the only municipal agency that currently produces groundwater from the SMGB. The City has been producing groundwater from the basin since the 1920’s and has been actively managing groundwater since the 1950’s. The City owns and operates three groundwater production well fields in the SMGB: Arcadia, Charnock, and Olympic well fields. The Santa Monica Groundwater Monitoring Program (Program) includes the following regulatory efforts: Coordination with the State Water Resources Control Board (SWRCB), the Division of Drinking Water (DDW), the Los Angeles Regional Water Quality Control Board (LARWQCB), and other stakeholders to remove industrial pollutants that have contaminated the groundwater of the basin. Coordination with the Department of Water Resources (DWR) and the Santa Monica Basin Groundwater Sustainability Agency (SMBGSA) to support implementation of the Santa Monica Basin Groundwater Sustainability Plan (GSP). The SMBGSA members include the City of Santa Monica, City of Los Angeles (via Los Angeles Department of Water and Power), Los Angeles County (via Planning Department), Culver City, and Beverly Hills. Support regulatory compliance efforts for monitoring and reporting related to groundwater recharge operations for the City’s Sustainable Water Infrastructure Project (SWIP), an advanced water treatment facility that treats a blend of wastewater and stormwater/urban runoff for non-potable reuse and indirect potable (i.e., groundwater recharge via direct injection). Multiple State regulatory agencies require groundwater monitoring in accordance with approved compliance schedules, including field sampling, laboratory analysis, and interpretation of groundwater quality and hydrogeologic data, as well as preparation and submittal of regulatory reports. These requirements exhibit substantial overlap in monitoring locations, analytical parameters, frequency, and reporting deliverables. To increase efficiency, ensure data consistency, and maintain regulatory compliance, the City proposes to implement an integrated groundwater monitoring pro

Responses are due October 26, 2026 at 3:00 PM PDT.

Questions must be submitted by October 12, 2026 at 3:00 PM PDT.

Commodity categories: Steam And Hot Water Fittings, Accessories, And Supplies; Steam And Hot Water Boilers And Steam Heating Equipment; Water And Wastewater Treating Chemicals; Water Supply, Groundwater, Sewage Treatment, And Related Equipment (Not For Air Conditioning, Steam Boiler, Or Laboratory Reagent Water); Engineering Consulting; Environmental Consulting.

Contact: Tina Saloutos, Principal Buyer (tina.saloutos@santamonica.gov, (310) 458-8281).

11 documents are attached to the notice: Proposer Checklist; PSA Template; PSA Insurance Template With Professional Liability; DDW August 2024 memo and Table 5 Summary Sheet; Early Warning Groundwater Quality Monitoring Program Report; Olympic Well Field 2012 Management Plan; Olympic Monitoring Well Program Summary; SMBGSA Wells Table Summary.

The full solicitation document, addenda and the question-and-answer thread are on the agency's OpenGov portal at https://procurement.opengov.com/portal/santa-monica-ca/projects/281364. Responses are submitted electronically there, and a free vendor account is required before you can upload one.

Reproduced from the official notice via OpenGov Procurement - California. The agency's page is the one that counts.

What the notice says

Questions due
12 Oct 2026

Read from the notice's own wording. BusyBids holds the notice, not the attached documents, and never assesses whether you meet a requirement - confirm anything that matters with the issuing agency.

Check before bidding

  • Questions close on 12 October, before the bid deadline.

Taken from the notice as published. BusyBids does not assess whether you meet a requirement - confirm anything that matters with the issuing agency.

Important dates

Add all to calendar
EventDate and time
Questions due 12 October 2026, 3:00 PM PDT check
Bid deadlinelast confirmed 26 Oct 26 October 2026, 3:00 PM PDT check closed

Times are shown in the agency's own zone. Confirm every deadline against the official notice.

Where this came from

Collected from OpenGov Procurement - California, first seen 29 September 2026, last confirmed 26 October 2026.

The notice text above and every date and requirement are reproduced from the source. Confirm every deadline against the official notice before you bid.

Something wrong with this listing? Tell us.

We reproduce what the agency published. If we got it wrong we want to know - a wrong deadline can cost you a bid.

Similar opportunities currently open

About City of Santa Monica

BusyBids has tracked 16 notices from City of Santa Monica since September 2026, 2 of them open now. The open work falls under Elevator, Plumbing.

Every City of Santa Monica bid BusyBids tracks

Get bids like this by email

This bid has closed. Get new bids by email. Free, no password needed.

Set up free alerts