San Francisco Airport (Construction) · Solicitation 10071.76 - TP 245

Terminal 3 West Modernization - TP 245 - East: Foundations / Piles

San Francisco, CA Special district Posted Sep 4, 2026 Last verified Oct 6, 4:20 PM
HVAC Plumbing Roofing Fencing Concrete Excavation & Grading Welding & Metal Fab General Contracting Site Utilities

What this bid is

Turner Construction Company, the design-builder for the Terminal 3 West Modernization at San Francisco International Airport, is seeking subcontract bids for trade package TP-245, East: Foundations / Piles. The work is deep foundations for the East Addition: furnishing and installing 20-inch diameter steel pipe piles, micro piles and foundation piles to support the building expansion, passenger boarding bridges and high mast light foundations. The scope also covers mobilization, pile testing, pile cutoffs, spoil and slurry handling, corrosion protection and all labor, equipment, materials and testing for a complete deep foundation system.

The estimated cost is $4.3M. The notice lists a CMD LBE participation requirement of 15% and a Local Preference set-aside. It also says prequalification criteria apply and directs questions to Briana Padilla at brpadilla@tcco.com. Check with her before bidding to learn whether you must be prequalified.

Bids are due 6 October 2026 at 5:00 PM PDT, submitted electronically through the agency's OpenGov portal, which requires a free vendor account. Solicitation number is 10071.76 - TP 245. The agency and design-builder make the award decision.

Who should bid

HVAC, Plumbing, Roofing, Fencing, Concrete, Excavation & Grading, Welding & Metal Fab, General Contracting, Site Utilities contractors - the work is San Francisco, CA. The notice flags Local Preference - confirm in the official notice whether that is a set-aside or a participation goal.

Deadline

6 October 2026, 5:00 PM PDT (last confirmed 6 Oct)

How to submit

On the agency's own system, not on BusyBids. Open the official notice

As the agency published it

San Francisco Airport (Construction) - Design-Builder has issued trade package advertisement, solicitation 10071.76 - TP 245.

Design-Builder Firm Name: Turner Construction Company Project Overview: Terminal 3 West Modernization The goal of this project is to expand Terminal 3 by approximately 631,022 gross square feet and to renovate approximately 516,644 gross square feet of the existing facility. The terminal will remain in operation throughout the project and will require extensive phasing. This will include upgrading building systems, seismic retrofit, improving passenger flow, enhancing the passenger experience, and new gates to maximize flexibility. Courtyard 4 Connector (C4C) The Courtyard 4 Connector (C4C) Project is a new 7-story core-and-shell building, part of the overall Terminal 3 West (T3W) Modernization Project. The T3W Project is a continuation of the Terminal 3 (T3) Program at San Francisco International Airport (SFO), which began with renovations and expansions of Boarding Area E (BAE) and Terminal 3 East (T3E). The T3W Project will renovate the western half of Terminal 3 to the same level of passenger experience that was achieved in the other airport terminal projects. The Courtyard 4 Connector Building will be built between Terminal 3 and the International Terminal (ITB) and will include secure passenger corridors and baggage handling systems connecting T3 and ITB. Additionally, the project will consist of space for offices, assembly (passenger lounges), airport employee amenity space, Customs & Border Protection (CBP) One-Stop passenger security screening checkpoint, loading dock, rooftop mechanical penthouse, and mechanical system upgrades within the existing pump station. Level 1 of C4C is open to the airfield and apron program while levels 2 and 3 are directly connected to T3 and are considered as an extension of that building for egress and plumbing fixture provisions. Trade Package No.: TP-245 Trade Package Title: East: Foundations / Piles Description of the Trade Package Scope of Work: The deep foundations scope for the East Addition include furnishing and installing 20-inch diameter steel pipe piles, micro piles, and foundation piles required to support the building expansion, passenger boarding bridges, and high mast light foundations. The scope also includes mobilization, pile testing, pile cutoffs, spoil and slurry handling, corrosion protection requirements, and all labor, equipment, materials, and testing necessary for a complete deep foundation system. Trade Package Bid Due Date and Time: 10/6/2026 by 5:00 PM Estimated Cost: $4.3M Main Trades of the Trade Package: Foundation, Piles, Concrete CMD LBE Participation Requirements %: 15% Design-Builder requirements or prequalification criteria: Please reach out to Briana Padilla at brpadilla@tcco.com for SFO and Turner prequalification criteria for this package. Contact for Trade Package information: Briana Padilla email: brpadilla@tcco.com

Responses are due October 6, 2026 at 5:00 PM PDT.

Commodity categories: Vents, Foundation, Concrete; Pile Drivers and Accessories; Construction Services, General (Incl. Maintenance And Repair Services); Construction Services, Trade (New Construction); Trade Services, Construction (Not Otherwise Classified); Public Works And Related Services.

The full solicitation document, addenda and the question-and-answer thread are on the agency's OpenGov portal at https://procurement.opengov.com/portal/sfoconstruction/projects/300517. Responses are submitted electronically there, and a free vendor account is required before you can upload one.

Reproduced from the official notice via OpenGov Procurement - California. The agency's page is the one that counts.

What the notice says

Prequalification
Mentioned

Read from the notice's own wording. BusyBids holds the notice, not the attached documents, and never assesses whether you meet a requirement - confirm anything that matters with the issuing agency.

Check before bidding

  • The notice refers to prequalification or a pre-qualified list - check whether you have to be on it before your bid will be opened.

Taken from the notice as published. BusyBids does not assess whether you meet a requirement - confirm anything that matters with the issuing agency.

Important dates

Add all to calendar
EventDate and time
Bid deadlinelast confirmed 6 Oct 6 October 2026, 5:00 PM PDT check closed

Times are shown in the agency's own zone. Confirm every deadline against the official notice.

Where this came from

Collected from OpenGov Procurement - California, first seen 25 September 2026, last confirmed 6 October 2026.

The notice text above and every date and requirement are reproduced from the source. Confirm every deadline against the official notice before you bid.

Something wrong with this listing? Tell us.

We reproduce what the agency published. If we got it wrong we want to know - a wrong deadline can cost you a bid.

Similar opportunities currently open

About San Francisco Airport (Construction)

BusyBids has tracked 17 notices from San Francisco Airport (Construction) since September 2026, 4 of them open now. The open work falls under General Contracting, Demolition, Doors & Hardware.

Every San Francisco Airport (Construction) bid BusyBids tracks

Get bids like this by email

This bid has closed. Get new bids by email. Free, no password needed.

Set up free alerts