What this bid is

The City of Homestead Power System is asking for bids to supply and deliver materials and equipment for the Donnie Avocado 138kV/13.2kV substation in Homestead, Florida. The buyer will purchase major long-lead substation components directly from manufacturers and suppliers, so this is a materials-and-delivery job rather than installation work. The substation is planned as a distribution station with two power transformers, supporting about 89 MVA of capacity.

The notice lists the bid deadline as 27 October 2026 at 2:00 PM EDT, with questions due 21 October 2026 at 5:00 PM EDT. Contact Lissandra Kmoch, Procurement Specialist II, at lkmoch@homesteadfl.gov or (305) 224-4620. The solicitation is ITB#202637, and it is a re-bid. The notice names women-owned, minority-owned and disadvantaged business enterprise set-asides, and the attached specs file is Donnie_Material_Specs.

Bids are submitted electronically through the City's OpenGov portal, which requires a free vendor account. The agency decides who is awarded the work.

Who should bid

Electrical, General Contracting contractors - the work is Homestead, FL. The notice flags Women-Owned Small Business, Minority-Owned Business, Disadvantaged Business Enterprise - confirm in the official notice whether that is a set-aside or a participation goal.

Deadline

27 October 2026, 2:00 PM EDT (last confirmed 27 Oct)

How to submit

On the agency's own system, not on BusyBids. Open the official notice

As the agency published it

City of Homestead - Procurement & Contract Services has issued invitation to bid, solicitation ITB#202637.

The City of Homestead Power System (HPS) is soliciting bids for the supply and delivery of materials and equipment required for the Donnie Avocado 138kV/13.2kV Substation Project. To support the project schedule and maintain greater control over equipment procurement, HPS will purchase major substation components directly from qualified manufacturers and suppliers. This solicitation is intended to secure critical long-lead electrical equipment and associated materials needed for the construction of the new substation. By procuring these materials directly, HPS can ensure timely delivery, compliance with project specifications, and compatibility with existing utility infrastructure. Vendors shall provide pricing, technical information, lead times, and all other requirements identified in the solicitation documents for the materials specified herein. The City of Homestead is an Equal Opportunity Employer and encourages participation from MBE/WBE/DBE businesses.

The City of Homestead Power System (HPS) is developing the Donnie Avocado 138kV/13.2kV Distribution Substation to support continued growth, enhance system reliability, and increase electrical capacity within its service territory. The new substation will be located in Homestead, Florida, and will serve as a critical component of the City's electric utility infrastructure. The facility is being designed as a 138kV/13.2kV distribution substation with a loop-in/loop-out transmission configuration and will ultimately support an approximate capacity of 89 MVA through the installation of two power transformers and associated distribution feeders. As part of this project, HPS is seeking qualified manufacturers and suppliers to furnish and deliver substation equipment and materials in accordance with the specifications and requirements contained in this solicitation. The equipment procured under this bid will be utilized in the construction and commissioning of the Donnie Avocado Substation and must meet all applicable industry standards, utility requirements, and project specifications. The City intends to procure high-quality equipment that supports long-term system reliability, operational efficiency, and compatibility with existing utility assets.

Responses are due October 27, 2026 at 2:00 PM EDT.

Questions must be submitted by October 21, 2026 at 5:00 PM EDT.

Commodity categories: Electric Power Generation, Transmission and Distribution; Electric Power Generation; Other Electric Power Generation; Electric Power Transmission, Control, and Distribution; Electric Bulk Power Transmission and Control; Electric Power Distribution; Electrical Contractors and Other Wiring Installation Contractors; Electrical Contractors and Other Wiring Installation Contractors.

Contact: Lissandra Kmoch, Procurement Specialist II (lkmoch@homesteadfl.gov, (305) 224-4620).

1 document is attached to the notice: Donnie_Material_Specs.

The full solicitation document, addenda and the question-and-answer thread are on the agency's OpenGov portal at https://procurement.opengov.com/portal/cityofhomestead/projects/303951. Responses are submitted electronically there, and a free vendor account is required before you can upload one.

Reproduced from the official notice via OpenGov Procurement - Florida. The agency's page is the one that counts.

What the notice says

Questions due
21 Oct 2026

Read from the notice's own wording. BusyBids holds the notice, not the attached documents, and never assesses whether you meet a requirement - confirm anything that matters with the issuing agency.

Check before bidding

  • Questions close on 21 October, before the bid deadline.

Taken from the notice as published. BusyBids does not assess whether you meet a requirement - confirm anything that matters with the issuing agency.

Important dates

Add all to calendar
EventDate and time
Questions due 21 October 2026, 5:00 PM EDT check
Bid deadlinelast confirmed 27 Oct 27 October 2026, 2:00 PM EDT check closed

Times are shown in the agency's own zone. Confirm every deadline against the official notice.

Where this came from

Collected from OpenGov Procurement - Florida, first seen 26 September 2026, last confirmed 27 October 2026.

The notice text above and every date and requirement are reproduced from the source. Confirm every deadline against the official notice before you bid.

Something wrong with this listing? Tell us.

We reproduce what the agency published. If we got it wrong we want to know - a wrong deadline can cost you a bid.

Similar opportunities currently open

About City of Homestead

BusyBids has tracked 9 notices from City of Homestead since September 2026, 2 of them open now. The open work falls under General Contracting.