McIntosh Park Wetland Construction
What this bid is
What the agency needs
IFB Invitation for Bids from City of Plant City - Plant City, FL
Who should bid
Landscaping, Excavation & Grading, General Contracting, Site Utilities contractors - the work is Statewide - FL.
Deadline
22 October 2026, 2:00 PM EDT (last confirmed 22 Oct)
How to submit
On the agency's own system, not on BusyBids. Open the official notice
As the agency published it
IFB Invitation for Bids from City of Plant City - Plant City, FL
City of Plant City - Utilities Operations has issued ifb invitation for bids, solicitation 26-048UO-IFB.
McIntosh Preserve is a 363-acre park, located within the City of Plant City. The project objective is to construct and restore wetlands to provide stormwater treatment and augment wetlands to maintain hydroperiods with reclaimed water from the City’s water reclamation facility. The excavated soils from the restored wetland footprint, will be kept on site and stacked to make a 50’ hill, in the shape of Florida. In addition to the excavation and planting of wetlands, the reclaimed water pipe infrastructure and associated apparatus; there are bid alternates for recreational amenities at the park such as restrooms and wetland boardwalks. Additionally, this project will be partially funded through a grant awarded by the State of Florida Department of Environmental Protection (see attached Grant Agreement No. LPA0038). All work performed, expenditures incurred, and project related actions shall be conducted in accordance with the terms and conditions of Grant Agreement LPA0038.
Responses are due October 8, 2026 at 2:00 PM EDT.
Questions must be submitted by September 21, 2026 at 2:00 PM EDT.
A non-mandatory pre-proposal conference is scheduled for September 10, 2026 at 10:30 AM EDT at Solid Waste and Utilities Management (SWUM) Building - 902 N. Mobley St., Plant City, FL 33563 May visit site at McIntosh Park if weather permits..
Commodity categories: Park, Playground, Recreational Area And Swimming Pool Equipment And Supplies; Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.); Construction, Sewer and Storm Drain; Construction, Utility/Underground Projects; Construction, Water System/Plants, Main and Service Line; Earth Handling, Grading, Moving, and Packing Equipment Maintenance and Repair; Park Area Construction/Renovation.
Contact: Jay Kwag, CIP Engineering Manager (hkwag@plantcitygov.com, (813) 365-4929).
161 documents are attached to the notice: ERP_Permit_43044733.02; USAC_SAJ-2024-04226(SP-CM)_McIntoshPreserve; CombinedSpecifications; 79173_-_City_of_Plant_City_-_EPC_PERMIT; 2020-06-03_-_LPA0038_-_Agreement_(executed_06.03.20); 2022-02-03_LPA0038_Amendment_1; 053-2023_-_LPA0038_-_Amendment_2; McIntosh_Park_100%_Wetland_Design_with_Electrical_061325.
The full solicitation document, addenda and the question-and-answer thread are on the agency's OpenGov portal at https://procurement.opengov.com/portal/plantcitygov/projects/268905. Responses are submitted electronically there, and a free vendor account is required before you can upload one.
Reproduced from the official notice via OpenGov Procurement - Florida. The agency's page is the one that counts.
What the notice says
- Site visit
- Mentioned
- Questions due
- 2 Oct 2026
Read from the notice's own wording. BusyBids holds the notice, not the attached documents, and never assesses whether you meet a requirement - confirm anything that matters with the issuing agency.
Check before bidding
- The notice describes a mandatory site visit or pre-bid meeting - a bid from anyone who did not attend is usually rejected unopened.
- The notice lists a pre-bid meeting on 10 September - check whether attendance is mandatory.
- Questions close on 2 October, before the bid deadline.
Taken from the notice as published. BusyBids does not assess whether you meet a requirement - confirm anything that matters with the issuing agency.
Important dates
Add all to calendar| Event | Date and time | |
|---|---|---|
| Pre-bid meetingcheck the notice for whether attendance is mandatory | 10 September 2026, 10:30 AM EDT check | |
| Questions due | 2 October 2026, 2:00 PM EDT check | |
| Bid deadlinelast confirmed 22 Oct | 22 October 2026, 2:00 PM EDT check | closed |
Times are shown in the agency's own zone. Confirm every deadline against the official notice.
Where this came from
Collected from OpenGov Procurement - Florida, first seen 25 September 2026, last confirmed 22 October 2026.
The notice text above and every date and requirement are reproduced from the source. Confirm every deadline against the official notice before you bid.
Something wrong with this listing? Tell us.
We reproduce what the agency published. If we got it wrong we want to know - a wrong deadline can cost you a bid.
Similar opportunities currently open
-
Due Nov 17, 11:00 AM EST Closes today
-
Checked yesterday CountyDue Nov 17, 2:00 PM EST Closes today
-
Posted Nov 12 Checked today CityDue Nov 17, 3:00 PM EST Closes today
-
Posted Oct 13 Checked today CityMandatory site visitDue Nov 17, 3:00 PM EST Closes today
-
Posted Oct 28 Checked today Special districtDue Nov 17, 3:00 PM EST Closes today
-
Posted Oct 13 Checked today CityDue Nov 17, 3:00 PM EST Closes today
About City of Plant City
BusyBids has tracked 5 notices from City of Plant City since September 2026, 2 of them open now. The open work falls under Site Utilities, Electrical.
Get bids like this by email
This bid has closed. Get new bids by email. Free, no password needed.