Pcac (36C776) (Veterans Affairs, Department Of) · Solicitation 36C77626B0026

Y1DA--573-21-106 EHRM Infrastructure Upgrades and Data Center Construction - Gainesville VAMC

Gainesville, FL Federal Posted Sep 16, 2026 Last verified Sep 17, 2:20 AM
General Contracting

Plain-English summary

Verify against the official notice

What the agency needs

Solicitation from Pcac (36C776) (Veterans Affairs, Department Of) — FL

Pcac (36C776) (Veterans Affairs, Department Of) has posted a federal contract opportunity with work in Gainesville, FL.

Notice type: Solicitation. Solicitation number: 36C77626B0026. NAICS code: 236220.

Responses are due September 24, 2026 at 1:00 PM UTC-04:00.

Set-aside: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14).

The full scope, drawings, wage determinations and submission instructions are on the SAM.gov notice itself. Federal bidding also requires an active SAM.gov registration with a Unique Entity ID before you can be awarded work, so start that early if you do not already have one.

Who should bid

General Contracting contractors - the work is Gainesville, FL. The notice flags Service-Disabled Veteran-Owned - confirm in the official notice whether that is a set-aside or a participation goal.

Deadline

24 September 2026, 1:00 PM EDT (last confirmed 17 Sep)

How to submit

On the agency's own system, not on BusyBids. Open the official notice · Bid documents

Important dates

Add all to calendar
EventDate and time
Bid deadlinelast confirmed 17 Sep 24 September 2026, 1:00 PM EDT check closed

Times are shown in the agency's own zone. Confirm every deadline against the official notice.

Bid documents

Downloaded from the agency, not from us - we link the package rather than hosting a copy, so you always get the current version.

Where this came from

Collected from SAM.gov Federal Opportunities, first seen 17 September 2026, last confirmed 17 September 2026.

The same solicitation was also published by SAM.gov Federal Opportunities.

Dates and requirements are reproduced from the source. Confirm every deadline against the official notice before you bid.

Something wrong with this listing? Tell us.

We reproduce what the agency published. If we got it wrong we want to know - a wrong deadline can cost you a bid.

Similar opportunities currently open

What Department of Veterans Affairs has paid for this work

43 General Contracting contracts awarded in the last 2 years in this state, median $98,252.

  • THE PATRIOTS SOLUTION GROUP CORP — $349,944 — 29 Sep 2026 — MIAMI_ EMERGENCY CHILLED WATER PUMP BUILDING 7 BASEMENT
  • HAMILTON PACIFIC CHAMBERLAIN LLC — $219,379 — 29 Sep 2026 — EO 14398
  • COVENTINA WATER, LLC — $113,060 — 25 Sep 2026 — FY26:DEIONIZED WATER SYSTEM MAINTENANCE LCHCC

Past contracts at this buyer, from USASpending.gov. They say what it has paid and to whom; they say nothing about who will win this bid.

Get bids like this by email

This bid has closed. Get new bids by email. Free, no password needed.

Set up free alerts