Eagan Civic Center Gymnasium Painting
What this bid is
The City of Florissant Parks and Recreation Department wants a painting contractor to repaint the gymnasium at the James J. Eagan Civic Center in Florissant, Missouri. The contractor would supply all labor, materials, equipment, and supervision. The ceiling would be painted black, the walls a base color, and three accent stripes added, two at 2 ft high and one at 3 ft high. The City will remove the drop ceiling before painting and will choose the wall colors and approve the stripe layout with the selected contractor.
The work period runs from a start date of January 18, 2027 to final completion on February 8, 2027, with final cleanup and inspection due by February 5, 2027. Questions are due November 19, 2026 at 5:00 PM CST. Bids are due November 24, 2026 at 2:00 PM CST and must be submitted electronically through the City's OpenGov portal, which requires a free vendor account. The notice describes a non-mandatory pre-proposal conference on November 10, 2026 at 9:00 AM CST at 1 James J. Eagan Drive. The City decides who is selected.
Who should bid
HVAC, Electrical, Painting, Flooring, Glazing & Windows, Excavation & Grading, Fire Protection, Hauling & Trucking contractors - the work is Florissant, MO.
Deadline
24 November 2026, 2:00 PM CST (10 days remaining - last confirmed 13 Nov)
How to submit
On the agency's own system, not on BusyBids. Open the official notice
As the agency published it
City of Florissant - Parks and Recreation has issued invitation for bid, solicitation 25-0272-PR.
General work description: The City of Florissant is seeking a qualified painting contractor to provide all labor, materials, equipment, tools, and supervision necessary to repaint the gymnasium at the James J. Eagan Civic Center. The project includes painting the gymnasium ceiling black and repainting the walls with a designated base color and three additional accent color stripes. All work shall be completed in a professional and workmanlike manner, with appropriate preparation and protection of the gymnasium floor, equipment, fixtures, and other existing surfaces. Scope of Work A. Site Preparation and Protection Inspect all surfaces to be painted and notify the City of any existing damage or conditions that may affect the finished product. Protect the gymnasium floor, basketball goals, bleachers, doors, windows, lights, vents, electrical fixtures, and other surfaces or equipment not designated for painting. Provide all necessary lifts, scaffolding, ladders, and other equipment required to safely access the ceiling and upper wall areas. Properly prepare all surfaces before painting, including cleaning, removing loose or peeling paint, and addressing minor surface imperfections. Mask and cover all adjacent surfaces to prevent paint overspray, splatter, or other damage. B. Gymnasium Ceiling Paint the entire designated gymnasium ceiling black. Prepare the ceiling surface to promote proper paint adhesion and a consistent finish. Apply a suitable primer where necessary based on the existing surface and condition. Apply the number of finish coats necessary to achieve uniform color, coverage, and appearance, following the paint manufacturer's recommendations. Protect or carefully work around existing lighting, ventilation systems, fire protection equipment, and other ceiling-mounted fixtures unless otherwise directed by the City. The City will be removing the drop ceiling prior to painting. C. Gymnasium Walls Prepare all designated wall surfaces for painting. Apply base color to the designated wall areas throughout the gymnasium. Apply three additional accent color stripes in locations and widths approved by the City of Florissant. two stipes at 2ft high one stripe at 3ft high Ensure the accent strips are straight, level, consistent in width, and cleanly defined, with sharp edges and no visible bleeding between colors. Apply sufficient coats to provide uniform coverage and a consistent finish across all designated surfaces. Wall colors will be chosen with the selected vendor D. Paint and Materials Provide all paint, primer, masking materials, drop cloths, and related supplies necessary to complete the project. Use commercial-grade paints appropriate for an indoor municipal gymnasium, including ceiling and wall surfaces. Provide durable, washable wall paint suitable for a high-traffic recreation facility. Submit proposed paint products, colors, finishes, and manufacturer specifications to the City for approval before purchasing materials or beginning work. The City will approve all final colors and the layout of the two accent stripes before application. Schedule and Coordination The contractor shall complete all work within the following project period: Start Date: January 18, 2027 Final Cleanup and Inspection: Completed by February 5, 2027 Final Completion February 8, 2027 The contractor shall coordinate with the City of Florissant Parks and Recreation Department before beginning work. The contractor must confirm access requirements, staging locations, work hours, and any facility restrictions with the City. The contractor shall provide a proposed work schedule identifying surface preparation, ceiling painting, wall painting, accent stripe application, drying time, cleanup, and final inspection. All work must be performed in a manner that allows the City to resume normal facility operations by the required completion date. Contractor Responsibilities The contractor shall: Furnish all labor, supervision, materials, equipment, tools, and transportation required for the project. Maintain a safe, orderly work area and comply with all applicable federal, state, and local safety requirements. Ensure employees are properly trained to operate lifts and other equipment used for the project. Providing 3/4 inch plywood for protection while driving lifts across the gymnasium flooring. Provide appropriate ventilation and follow all manufacturer requirements for application, drying, and curing. Prevent unauthorized access to the work area while painting or other hazardous operations are underway. Remove all masking materials, debris, empty containers, and other project-related waste upon completion. Repair or pay for damage caused by the contractor to City property, equipment, or existing finishes. Notify the City promptly of unforeseen conditions, delays, or additional work that may affect the schedule or project cost. Obtain written approval from the City before performing work outside the approved scope. Provide dumpster f
Responses are due November 24, 2026 at 2:00 PM CST.
Questions must be submitted by November 19, 2026 at 5:00 PM CST.
A non-mandatory pre-proposal conference is scheduled for November 10, 2026 at 9:00 AM CST at 1 James J. Eagan Drive, Florissant, MO 63033.
Commodity categories: Painting and Wall Covering Contractors; Painting and Wall Covering Contractors.
Contact: Jimmy Kirincich, Director of Parks and Recreation (jkirincich@florissantmo.com, (314) 839-7657).
9 documents are attached to the notice: WORK AUTHORIZATION AFFIDAVIT FOR BUSINESS ENTITIES; STATE OF MISSOURI LABOR PROVISIONS; Bid Contract Template; General_Conditions 11-3-2026; Special Conditions - Rev. 11-3-26; Annual Wage Order No. 33; Instructions to Bidders; anti-demonstration-against-israel (1).
The full solicitation document, addenda and the question-and-answer thread are on the agency's OpenGov portal at https://procurement.opengov.com/portal/florissantmo/projects/315510. Responses are submitted electronically there, and a free vendor account is required before you can upload one.
Reproduced from the official notice via OpenGov Procurement - Missouri. The agency's page is the one that counts.
What the notice says
- Site visit
- Mentioned
- Questions due
- 19 Nov 2026
Read from the notice's own wording. BusyBids holds the notice, not the attached documents, and never assesses whether you meet a requirement - confirm anything that matters with the issuing agency.
Check before bidding
- The notice describes a mandatory site visit or pre-bid meeting - a bid from anyone who did not attend is usually rejected unopened.
- The notice lists a pre-bid meeting on 10 November - check whether attendance is mandatory.
- Questions close on 19 November, before the bid deadline.
Taken from the notice as published. BusyBids does not assess whether you meet a requirement - confirm anything that matters with the issuing agency.
Important dates
Add all to calendar| Event | Date and time | |
|---|---|---|
| Pre-bid meetingcheck the notice for whether attendance is mandatory | 10 November 2026, 9:00 AM CST check | |
| Questions due | 19 November 2026, 5:00 PM CST check | |
| Bid deadline10 days remaining - last confirmed 13 Nov | 24 November 2026, 2:00 PM CST check | 10 days |
Times are shown in the agency's own zone. Confirm every deadline against the official notice.
Save this bid
We will remind you before it closes and tell you if the deadline moves. Free, no password, one click to stop.
We never share your address. No password needed.
Where this came from
Collected from OpenGov Procurement - Missouri, first seen 3 November 2026, last confirmed 13 November 2026.
The notice text above and every date and requirement are reproduced from the source. Confirm every deadline against the official notice before you bid.
Something wrong with this listing? Tell us.
We reproduce what the agency published. If we got it wrong we want to know - a wrong deadline can cost you a bid.
Similar open bids
-
Posted Nov 5 Checked yesterday CityDue Nov 24, 10:00 AM CST 10 days left
-
Posted Nov 10 Checked yesterday FederalDue Dec 11, 10:00 AM EST 27 days left
-
Posted Oct 9 Checked 12 days ago FederalDue Nov 16, 1:00 PM EST 2 days left
-
Posted Oct 2 Last checked 26 Oct FederalDue Nov 25, 3:00 PM EST 11 days left
About City of Florissant
BusyBids has tracked 4 notices from City of Florissant since September 2026, 2 of them open now. The open work falls under Flooring, HVAC, Painting.