City of Santa Fe, NM · Solicitation FY27-RFQ-094

Santa Fe Regional Airport Airfield Preservation Rehabilitation, Maintenance and Design

Santa Fe, NM City Posted Nov 10, 2026 Last verified Nov 13, 8:20 PM
Paving & Asphalt Excavation & Grading General Contracting Traffic & Striping Surveying & Engineering 9 days remaining

What this bid is

The Santa Fe Regional Airport in Santa Fe, NM is asking for qualification-based proposals from architectural and engineering firms to provide design services on several airfield projects. This is a design and planning request, not a construction bid. The work covers evaluating conditions and preparing plans and specifications for runway safety area grading, pavement preservation and rehabilitation on Runways 02/20 and 15/33, possible runway 02/20 extension, rehabilitation or reconstruction, a pavement maintenance plan, an airfield marking maintenance plan, and rubber buildup removal strategy. The City, through the airport, will decide who is selected.

Responses are due 23 November 2026 at 3:00 PM MST, submitted electronically through the City's OpenGov portal, where a free vendor account is needed to upload. Questions are due 17 November 2026 at 5:00 PM MST. The notice lists a pre-proposal conference on 13 November 2026 at 1:30 PM MST by Microsoft Teams and calls it non-mandatory, but BusyBids' own note says attendance may be required, so check the official notice before deciding. Contact is Sebastian Gallegos, Airport Project Manager, at sfgallegos@santafenm.gov or (505) 695-3538.

Who should bid

Paving & Asphalt, Excavation & Grading, General Contracting, Traffic & Striping, Surveying & Engineering contractors - the work is Santa Fe, NM.

Deadline

23 November 2026, 3:00 PM MST (9 days remaining - last confirmed 13 Nov)

How to submit

On the agency's own system, not on BusyBids. Open the official notice

As the agency published it

City of Santa Fe, NM - Airport has issued request for qualifications, solicitation FY27-RFQ-094.

The Santa Fe Regional Airport (Airport) is soliciting qualification-based proposals from qualified architectural and engineering (A&E) firms to provide professional design services for multiple airfield preservation, rehabilitation, and maintenance projects. Runway 02/20 is the Airport's primary runway and serves as the designated runway for commercial airline arrivals and departures, including regional jet operations. During the Federal Aviation Administration's (FAA) most recent annual inspection, deficiencies and areas requiring corrective action were identified on both Runway 02/20 and the secondary Runway 15/33. These findings, along with the Airport's ongoing infrastructure preservation needs, have established the need for professional A&E services to evaluate existing conditions, develop appropriate design solutions, and prepare plans and specifications for the required improvements. The projects requiring attention include, but are not limited to, the following: Runway Safety Area (RSA) Grading Improvements: Evaluate and develop corrective grading improvements to address deficiencies within the RSAs for Runways 02/20 and 15/33. Runway Pavement Preservation: Evaluate pavement conditions and develop preservation and rehabilitation improvements for Runways 02/20 and 15/33. Runway 02/20 Improvements: Evaluate alternatives and develop design plans for improvements to Runway 02/20, which may include runway extension, rehabilitation, or reconstruction. Pavement Maintenance Plan (PMP): Develop a comprehensive pavement maintenance plan to support the ongoing assessment, preservation, and management of airport pavement infrastructure. Airfield Marking Maintenance Plan: Develop a maintenance plan for airfield pavement markings to ensure continued visibility, compliance, and operational safety. Airfield Rubber Removal: Evaluate existing rubber accumulation and develop appropriate removal and maintenance strategies to maintain runway surface conditions and operational safety. The selected A&E firm will be expected to provide the professional expertise necessary to evaluate existing conditions, assess alternatives, develop recommendations, and prepare the required engineering designs, plans, specifications, and related deliverables for these projects. The overall objective is to maintain and improve the safety, operational efficiency, and long-term reliability of the Airport's airfield infrastructure.

The Santa Fe Regional Airport was originally constructed in 1945 and has served as a primary source of commercial air transportation for Santa Fe and Northern New Mexico. As commercial aviation activity and passenger demand have grown, the need for continued infrastructure maintenance, rehabilitation, and expansion has become increasingly important to accommodate current operations and future growth. The airport's original development included approximately five miles of combined runway length and infrastructure designed to accommodate some of the military's heaviest aircraft. In 1957, a major airport expansion was completed through a joint effort between the City of Santa Fe and Santa Fe County, establishing what was then known as the Santa Fe Municipal Airport. This expansion included significant improvements to the airfield, particularly the runways, taxiways, and airline terminal apron. The first major runway rehabilitation, which included resurfacing, took place in 1972 to support the airport's continued operational needs and anticipated growth. Subsequent rehabilitation of Runway 02/20 included resurfacing in 2005 and milling and overlay work in 2017. The airport currently operates two primary runways: Runway 02/20: 8,366 feet long and 150 feet wide. Runway 15/33: 6,316 feet long and 100 feet wide. Given the airport's continued growth and the ongoing demands placed on its infrastructure, maintaining, modernizing, and expanding airport facilities is essential to ensuring the continued safety, efficiency, and reliability of airport operations.

Responses are due November 23, 2026 at 3:00 PM MST.

Questions must be submitted by November 17, 2026 at 5:00 PM MST.

A non-mandatory pre-proposal conference is scheduled for November 13, 2026 at 1:30 PM MST at https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZDE1NWE3MTYtY2RkYS00ZGZkLTljYWUtYzliM2UwZjY2NDM3%40thread.v2/0?context=%7b%22Tid%22%3a%2277b69f5a-55ed-4363-8616-4867b0bc707f%22%2c%22Oid%22%3a%228d3a19bb-3961-4588-8915-1014f4def1c1%22%7d.

Contact: Sebastian Gallegos, Airport Project Manager (sfgallegos@santafenm.gov, (505) 695-3538).

The full solicitation document, addenda and the question-and-answer thread are on the agency's OpenGov portal at https://procurement.opengov.com/portal/santafenm/projects/299974. Responses are submitted electronically there, and a free vendor account is required before you can upload one.

Reproduced from the official notice via OpenGov Procurement - New Mexico. The agency's page is the one that counts.

What the notice says

Site visit
Mentioned
Questions due
17 Nov 2026

Read from the notice's own wording. BusyBids holds the notice, not the attached documents, and never assesses whether you meet a requirement - confirm anything that matters with the issuing agency.

Check before bidding

  • The notice describes a mandatory site visit or pre-bid meeting - a bid from anyone who did not attend is usually rejected unopened.
  • The notice lists a pre-bid meeting on 13 November - check whether attendance is mandatory.
  • Questions close on 18 November, before the bid deadline.

Taken from the notice as published. BusyBids does not assess whether you meet a requirement - confirm anything that matters with the issuing agency.

Important dates

Add all to calendar
EventDate and time
Pre-bid meetingcheck the notice for whether attendance is mandatory 13 November 2026, 1:30 PM MST check
Questions due 17 November 2026, 5:00 PM MST check
Bid deadline9 days remaining - last confirmed 13 Nov 23 November 2026, 3:00 PM MST check 9 days

Times are shown in the agency's own zone. Confirm every deadline against the official notice.

Save this bid

We will remind you before it closes and tell you if the deadline moves. Free, no password, one click to stop.

We never share your address. No password needed.

Where this came from

Collected from OpenGov Procurement - New Mexico, first seen 11 November 2026, last confirmed 13 November 2026.

The notice text above and every date and requirement are reproduced from the source. Confirm every deadline against the official notice before you bid.

Something wrong with this listing? Tell us.

We reproduce what the agency published. If we got it wrong we want to know - a wrong deadline can cost you a bid.

Similar open bids

About City of Santa Fe, NM

BusyBids has tracked 8 notices from City of Santa Fe, NM since September 2026, 2 of them open now. The open work falls under Excavation & Grading, General Contracting, Hauling & Trucking.

Every City of Santa Fe, NM bid BusyBids tracks