Water & Wastewater
Published government contract notices, guides and news.
All guides · Browse all open bidsRAB25433LS - Jim Walters and Port O’Call South Lift Station Improvements
Lift Station Rehabilitation — The City of Runaway Bay — Wise County, TX
Ironwood Phase 0
Water, Wastewater, Drainage, Paving, TxDOT improvements — W Land Development — Bastrop County, TX
City of Reno - Wastewater Plant Rehabilitation
construction — City of Reno — Lamar County, TX
E Goode St (Hwy 154) Sewer Line Replacement
Replacement of existing 8-in sewer main with 10-in sewer main in TxDOT right-of-way. Moving sewer services from existing parallel 6-in sewer to 8-in/10-in sewer. Removal of 6-in sewer in TxDOT right-of-way. — City of Quitman — Wood County, TX
SS-016 – Langston Regional Lift Station,
Langston Regional Lift Station — City of Mont Belvieu — Chambers County, TX
Proposed Water Distribution, Wastewater Collection, Paving, and Storm Water Facilities to Serve Bellamina Section Two
Storm Water Facilities — Waller County Municipal Utility District No. 59 — Waller County, TX
Reconstruction of Old Houston Highway
Highway Reconstruction — City of Waller — Waller County, TX
Blinn College Utility Extension
Utility Extension — City of Waller — Waller County, TX
WTP Clarifier Drive Replacements for Travis County WCID No. 18
Clarifier Drive Replacements at a WTP — Travis County WCID No. 18 — Travis County, TX
Grangerland Meadows Section 2 Water, Sanitary, Drainage, & Paving
Spear Point Engineering — Montgomery County, TX
The Ranch 10709 Cow Creek Road
Sitework, including paving, grading, and utilities; construction of a riser room — Tranquil Shores, LLC — Travis County, TX
The Ranch 10709 Cow Creek Road Public Water System Construction
Public Water Supply Plant construction — Tranquil Shores, LLC. — Travis County, TX
EARZ Wild Springs -Sewer Main Replacement
Construction — San Antonio Water System — Bexar County, TX
Firefly Pointe Phase 4
Water, Wastewater, Drainage and Paving — Lennar Homes of Texas Land and Construction, Ltd. — Williamson County, TX
Casa Blanca Southwest & Central Robstown GLO CDBG MIT-MOD CONTRACT NO. 24-065-108-E921
Roadway and Drainage Improvements — City of Robstown — Nueces County, TX
Water, Sanitary Sewer, Drainage Facilities & Alternate Paving to Serve Winfield - Bay Area Blvd, Ervin Street, Section 1 and Section 6
Construction — Galveston County MUD No. 69 — Galveston County, TX
City of Pinehurst 2019 Disaster CDBG-DR Contract No. 25-147-006-F360 Flood & Drainage
Flood and Drainage Improvements — City of Pinehurst, Texas — Orange County, TX
Construction of Emberly Wastewater Treatment Plant Expansion to 0.71 MGD for FBC MUD No. 250
Wastewater Treatment Plant — FBC MUD No. 250 — Fort Bend County, TX
Chatfield WSC - Gurrola Water Improvements
Water Distribution Line Extension — SANDRA GURROLA C/O CHATFIELD WSC 2678 NE CR 2040 POWELL, TEXAS 75153 — Navarro County, TX
CLCWA - Sanitary Sewer Phase 107 Manhole Rehabilitation
Sanitary Sewer Manhole Rehabilitation — Clear Lake City Water Authority — Harris County, TX