Supervisory Control and Data Acquisition (SCADA) Controls & Instrumentation
What this bid is
The County of DeKalb, Georgia, Department of Watershed Management is asking for bids on Supervisory Control and Data Acquisition (SCADA) controls and instrumentation work across its water and wastewater facilities in Decatur, Georgia. The work covers the two wastewater treatment plants, about sixty-seven lift stations and related remote sites, and the drinking water system, including a water treatment plant, a raw water intake, storage tanks and booster stations. Duties named in the notice include corrective and preventive maintenance, repair and replacement, writing programs, and installing monitoring and control cards on Siemens, Allen-Bradley, Rockwell, Wonderware and Citec systems. The county also wants on-call emergency and on-demand service.
The notice says a payment bond and a performance bond apply, that prevailing wage rates apply with certified payroll, and that a pre-bid meeting is held on December 7, 2026 at 10:00 AM EST by Microsoft Teams. Site visits are listed for December 7 and 8, 2026. Questions are due December 18, 2026 at 5:00 PM EST, and bids are due January 11, 2027 at 3:00 PM EST through the OpenGov portal, which requires a free vendor account. Solicitation number 2026-154-ITB. The county decides who is selected.
Who should bid
Electrical, Site Utilities contractors - the work is Decatur, GA.
Deadline
11 January 2027, 3:00 PM EST (55 days remaining - last confirmed 17 Nov)
How to submit
On the agency's own system, not on BusyBids. Open the official notice
As the agency published it
County of DeKalb, GA - Purchasing & Contracting has issued invitation to bid, solicitation 2026-154-ITB.
The County of DeKalb, GA (the "County"), is soliciting sealed Bids for Supervisory Control and Data Acquisition (SCADA) Controls & Instrumentation. Bids are to be submitted via the County's eProcurement Portal via https://procurement.opengov.com/portal/dekalbcountyga PRIOR TO 3:00 PM on January 11, 2027. Late Bids will not be accepted. Under this contract, the Contractor will perform work at the County’s water and wastewater treatment collection and distribution facilities as well as any remote monitoring or control stations. The Wastewater facilities include two treatment plants; and approximately sixty-seven lift stations and associated remote facilities. The Drinking Water facilities include one water treatment plant, one raw water intake facility, seven ground storage tanks, five elevated tanks, five water booster stations, one stand pipe and multiple pressure monitoring locations. Work will involve corrective and preventive maintenance, repair and replacement services, writing programs or installing monitoring; and control cards for the Siemens and Allen-Bradley SCADA and telemetry systems utilizing Rockwell Factory Talk, Schneider Electric Wonderware and Citec HMI systems, Allen Bradley PLCs, and various other software/hardware.
The Department of watershed management is dependent upon six different SCADA systems to manage and operate its day to day processes. These systems use a variety of software, computer-based hardware and instrumentation that need routine repair and maintenance. The Department of Watershed Management at Dekalb County, GA (DWM) is seeking vendors with expertise in SCADA, Instrumentation, and Controls to support DWM’s ongoing operations and provide on-call emergency and on-demand services.
Responses are due January 11, 2027 at 3:00 PM EST.
Questions must be submitted by December 18, 2026 at 5:00 PM EST.
A non-mandatory pre-proposal conference is scheduled for December 7, 2026 at 10:00 AM EST at Pre-Bid meeting will be held on 12/7/2026 via Microsoft Teams at the below link. (https://teams.microsoft.com/meet/2122404396316473?p=R7EK08SUTjYsYKSN50) Passcode: d2Zz6m6K Site visits will be held at the following times: 1. On 12/7/2026 at 1:00PM Scott Candler Water Treatment Plant 4830 Winters Chapel Rd, Doraville GA 30360 2. On 12/8/2026 at 9:00AM Snapfinger Advance Wastewater Treatment Plant 4124 Flakes Mill, Decatur GA 30034 3. On 12/8/2026 at 10:30AM Pole Bridge Advance Wastewater Treatment Plant 4664 Flat Bridge Road, Stonecrest GA 30038.
Commodity categories: Controllers, Programmable: Industrial Control Devices, Robots, etc., Environmentally Certified Products; Project Management; Telemetry Equipment; Instrumentation Equipment, Parts and Accessories (Actuators, Analyzers, Regulators, Controllers, Transducers, etc.); Environmental Consulting; Software Maintenance/Support; System Implementation and Engineering Services; Engineering Services, Professional.
Contact: Victor Wills, Procurement Manager, Team CIP (vwills@dekalbcountyga.gov, (404) 687-3562).
8 documents are attached to the notice: EXHIBIT A - Example list of the Instrumentation; Exhibit B - Work Order Form; Exhibit C - Areas of Work; PAYMENT BOND; PERFORMANCE BOND; DAVIS-BACON AND RELATED ACTS INFO; LSBE INFORMATION; FIRST SOURCE JOBS ORDINANCE.
The full solicitation document, addenda and the question-and-answer thread are on the agency's OpenGov portal at https://procurement.opengov.com/portal/dekalbcountyga/projects/324077. Responses are submitted electronically there, and a free vendor account is required before you can upload one.
Reproduced from the official notice via OpenGov Procurement - Georgia. The agency's page is the one that counts.
What the notice says
- Bond
- Mentioned; the notice gives no amount
- Site visit
- Mentioned
- Prevailing wage
- Mentioned
- Submission
- Bids are to be submitted via the County's eProcurement Portal via https://procurement.
- Questions due
- 18 Dec 2026
Read from the notice's own wording. BusyBids holds the notice, not the attached documents, and never assesses whether you meet a requirement - confirm anything that matters with the issuing agency.
Check before bidding
- The notice mentions a bid, performance or payment bond - confirm the amount and the form with the agency before you price the job.
- The notice says prevailing wage rates apply - your labour costs have to be priced at the published rates, and certified payroll usually follows.
- The notice describes a mandatory site visit or pre-bid meeting - a bid from anyone who did not attend is usually rejected unopened.
- The notice lists a pre-bid meeting on 7 December - check whether attendance is mandatory.
- Questions close on 18 December, before the bid deadline.
Taken from the notice as published. BusyBids does not assess whether you meet a requirement - confirm anything that matters with the issuing agency.
Important dates
Add all to calendar| Event | Date and time | |
|---|---|---|
| Pre-bid meetingcheck the notice for whether attendance is mandatory | 7 December 2026, 10:00 AM EST check | |
| Questions due | 18 December 2026, 5:00 PM EST check | |
| Bid deadline55 days remaining - last confirmed 17 Nov | 11 January 2027, 3:00 PM EST check | 55 days |
Times are shown in the agency's own zone. Confirm every deadline against the official notice.
Save this bid
We will remind you before it closes and tell you if the deadline moves. Free, no password, one click to stop.
We never share your address. No password needed.
Where this came from
Collected from OpenGov Procurement - Georgia, first seen 17 November 2026, last confirmed 17 November 2026.
The notice text above and every date and requirement are reproduced from the source. Confirm every deadline against the official notice before you bid.
Something wrong with this listing? Tell us.
We reproduce what the agency published. If we got it wrong we want to know - a wrong deadline can cost you a bid.
Similar open bids
-
Posted Oct 5 Checked today CountyBond requiredPrevailing wage appliesMandatory site visitDue Nov 23, 3:00 PM EST 6 days left
-
Posted Oct 15 Checked today CountyMandatory site visitDue Nov 24, 10:00 AM EST 7 days left
-
Posted Oct 28 Checked today CountyDue Nov 25, 3:00 PM EST 8 days left
-
Posted Nov 9 Checked today CountyBond requiredPrevailing wage appliesDue Dec 1, 3:00 PM EST 14 days left
-
Posted Sep 28 Checked today CountyBond requiredPrevailing wage appliesPrequalification requiredMandatory site visitDue Dec 1, 3:00 PM EST 14 days left
-
Posted Oct 22 Checked today CountyDue Dec 3, 3:00 PM EST 16 days left
About County of DeKalb, GA
BusyBids has tracked 25 notices from County of DeKalb, GA since September 2026, 12 of them open now. The open work falls under Site Utilities, Concrete, Electrical.