Orange County Water Control and Improvement District No. 1 · Solicitation B877-1009

Orange County Water Control and Improvement District No. 1 Water Treatment System Improvements, Water Wells 4, 5, & 7

Orange County, TX Special district Posted Oct 15, 2026 Last verified Oct 31, 6:20 AM
Electrical Paving & Asphalt Painting Demolition Excavation & Grading General Contracting Site Utilities Hauling & Trucking 5 days remaining

What this bid is

Orange County Water Control and Improvement District No. 1 wants a contractor to rehabilitate the water treatment system at Water Wells 4, 5, and 7 in Vidor, Texas. The work adds liquid ammonium sulfate for disinfection. The notice describes revised well header piping at all three wells, inline static mixers with chemical injection ports, a new chemical building at each well site to hold a double wall storage tank and feed system, and a metering pump with its power, controls and electrical gear. The water treatment plant must stay running while the work is done, and the contractor must restore disturbed surfaces, including pavement and rock driveways, and document nearby streets by video before starting.

Well 4 is on Caney Creek Road, Well 5 is on State Highway 1132, and Well 7 is on State Highway 12. A non-mandatory pre-bid meeting is set for 28 October 2026 at 10:00 AM CDT at 460 East Bolivar, Vidor, TX 77662. Bids are due 5 November 2026 at 2:00 PM CST at the same address. Plans, specifications and addenda are posted on CIVCAST, where bidders also register as plan holders. Solicitation number B877-1009.

Who should bid

Electrical, Paving & Asphalt, Painting, Demolition, Excavation & Grading, General Contracting, Site Utilities, Hauling & Trucking contractors - the work is Orange County, TX.

Deadline

5 November 2026, 2:00 PM CST (5 days remaining - last confirmed 31 Oct)

How to submit

On the agency's own system, not on BusyBids. Open the official notice

As the agency published it

The water improvements to the Orange County Water Control And Improvement District No. 1 Water Treatment System Improvements Water Wells 4, 5, & 7, generally described as the rehabilitation of the City’s Water Treatment System, consist of adding liquid ammonium sulfate (LAS) for disinfection. Well No. 4 is located on Caney Creek Road, Well No. 5 is located on State Highway 1132 and Well No. 7 is located on State Highway 12, all wells are in Vidor, Texas. The proposed scope of work includes revisions to the well header piping at all three water wells to accommodate new inline static mixers equipped with chemical injection ports for each disinfectant. A new chemical building is also proposed at each well site to store the LAS double wall storage bulk tank and the chemical feed system. Work completed under this contract will require the Water Treatment Plant to remain operational until work is completed. This project shall also provide for demolition, furnishings, temporary facilities, equipment, materials, testing, and all necessary appurtenances. Contractor shall install metering pump as shown on drawings, including providing power and controls and all necessary electrical gear for a complete and operational system. This contract shall include all necessary superintendence, labor, materials, equipment, tools, piping, field jointing, cleaning, painting, grouting, excavation, trenching, shoring, fill, grading, backfill, surface restoration, testing, clearing, hauling and disposal of excess select soils, and incidental items necessary for the construction of the proposed facilities as shown in the plans and documented in the specifications. Prior to the start of construction, the Contractor shall submit a construction schedule to the Engineer detailing his anticipated activities with estimated dates for the completion of each activity and section. The Contractor shall provide a minimum of two (2) weeks’ notice to the Engineer prior to the beginning of the work at each individual site and prior to taking any portion of the operations of the existing sites out of service. The Contractor is responsible for the restoration of all disturbed surfaces, including pavement and rock driveways. All surfaces shall be returned to original condition or better. This includes streets, road surfaces, and ditches outside of the project area within the surrounding neighborhoods. The contractor is advised to create a video of all City streets that might be traveled by his operators in route to any part of the project, prior to the start of construction to document existing street conditions. The Contractor shall be responsible for the startup and testing of each system embraced in this Contract. All systems shall be demonstrated to be functioning at design conditions prior to being considered complete. Where requested or required by the Engineer, the Contractor shall submit test data and certify in writing that the systems tested performed as required by the plans and specifications at design conditions.

Owner: Orange County Water Control and Improvement District No. 1 · Project number: B877-1009 · Location: Orange County, TX

Bids are due Thursday, November 5, 2026 at 2:00 PM CST, Orange County Water Control and Improvement District No. 1 460 East Bolivar, Vidor, TX 77662.

A pre-bid meeting is set for Wednesday, October 28, 2026 at 10:00 AM CDT, Orange County Water Control and Improvement District No. 1 460 East Bolivar, Vidor, TX 77662.

Non-mandatory

3 documents (plans, specifications and addenda) are posted on CIVCAST at https://app.civcast.com/bid-opportunities/projects/6ad149559e376e32d52271f7, where bidders also register as plan holders.

Reproduced from the official notice via CIVCAST Bid Opportunities. The agency's page is the one that counts.

Check before bidding

  • The notice lists a pre-bid meeting on 28 October - check whether attendance is mandatory.
  • Only 5 days left to prepare a bid.

Taken from the notice as published. BusyBids does not assess whether you meet a requirement - confirm anything that matters with the issuing agency.

Important dates

Add all to calendar
EventDate and time
Pre-bid meetingcheck the notice for whether attendance is mandatory 28 October 2026, 10:00 AM CDT check
Bid deadline5 days remaining - last confirmed 31 Oct 5 November 2026, 2:00 PM CST check 5 days

Times are shown in the agency's own zone. Confirm every deadline against the official notice.

Save this bid

We will remind you before it closes and tell you if the deadline moves. Free, no password, one click to stop.

We never share your address. No password needed.

Where this came from

Collected from CIVCAST Bid Opportunities, first seen 16 October 2026, last confirmed 31 October 2026.

The notice text above and every date and requirement are reproduced from the source. Confirm every deadline against the official notice before you bid.

Something wrong with this listing? Tell us.

We reproduce what the agency published. If we got it wrong we want to know - a wrong deadline can cost you a bid.

Similar open bids